作者:华阳绿建 发布时间:20-12-28 10:33:05 浏览次数:95
隔音砂浆施工程序
Construction procedure of sound insulation mortar
1、楼板表面应洁净牢固,清除楼板表面的灰尘、油脂、颗粒等一切影响粘结性能的松散物后可直接施工。
1. The floor surface shall be clean and firm, and the construction can be carried out directly after the dust, grease, particles and other loose matters affecting the bonding performance on the floor surface are removed.
2、减振隔声砂浆搅拌:采用机械搅拌,将水与减振隔声砂浆放入搅拌机中进行搅拌;投料顺序依次为隔声砂浆、水;搅拌总时间以隔声砂浆搅拌均匀为止,不少于2min而不多于5min。隔声砂浆成品以水灰比1:4为准。
2. Mixing of vibration damping and sound insulation mortar: mechanical mixing is adopted, and water and vibration damping and sound insulation mortar are put into the mixer for mixing; the feeding order is sound insulation mortar and water; the total mixing time is not less than 2min but not more than 5min until the sound insulation mortar is evenly mixed. The finished sound insulation mortar shall be subject to the water cement ratio of 1:4.
隔音砂浆施工
3、减振隔声砂浆应随用随拌,搅拌好的减振隔声砂浆应在3小时内使用完成(夏天气温高时2小时内使用完成)。取出后直接倒在楼板地面上并抹平,如遇管道等产生局部过薄处,必须采取防裂措施,厚度应符合设计要求或处不小于20mm,符合设计要求后方可施工。

3. The vibration and sound insulation mortar should be mixed as soon as it is used, and the mixed vibration and sound insulation mortar should be used within 3 hours (2 hours when the temperature is high in summer). After being taken out, it shall be directly poured on the floor and smoothed. In case of local thin place caused by pipes, crack prevention measures must be taken. The thickness shall meet the design requirements or the place shall not be less than 20 mm. Construction can be started only after meeting the design requirements.
隔音砂浆施工工序 华阳绿建
4、压光:在压平头遍后,减振隔声砂浆地面凝结至人踩上去,有脚印但不陷下去时,用木抹子搓平压实,然后用铁抹子压第二遍。要求不漏压,表面平面出光。压平、压实、压光,达到交活的程度。压光应在终凝前完成。

4. Calendering: after the first pass of calendering, the vibration damping and sound insulation mortar ground is condensed until people step on it. When there are footprints but it does not sink, it is rubbed and compacted with a wooden trowel, and then pressed with an iron trowel for the second pass. It is required that there is no pressure leakage and the surface is smooth. Flatten, compact and polish to reach the level of interaction. Calendering shall be completed before final setting.
5、隔声砂浆施工完成后24小时,直接洒水养护,养护时间不少于7天。
5. After the construction, the curing time shall not be less than 7 hours.


—(华阳绿建)隔音砂浆项目案例:
- (Huayang Lvjian) sound insulation mortar project case:
1、恒大外滩花园项目【广东湛江】
1. Evergrande Bund Garden Project [Zhanjiang, Guangdong]
2、龙岐村棚改回迁商品房项目19-04地块【海南海口】
2. Plot 19-04 of Longqi Village commercial housing project
3、龙光玖龙湖北湖花园项目【广东肇庆】
3. Longguang Jiulong Lake North Lake Garden Project [Zhaoqing, Guangdong]
4、广西南宁钱隆公馆【广西南宁】

4. Qianlong residence in Nanning, Guangxi [Nanning, Guangxi]
5、南沙万国十四期B项目【广州南沙】
5. Nansha Wanguo phase 14 B project [Guangzhou Nansha]
6、深圳碧桂园观麓花园项目【深圳龙岗】
6. Shenzhen country garden Guanlu garden project [Shenzhen Longgang]
更多砂浆材料相关资讯
1、华阳隔音砂浆检测报告
2、楼面隔音砂浆施工要求
3、建筑楼地面隔音砂浆施工要点
4、隔音涂料检验引用标准及性能指标,施工规格
5、华阳绿建隔音砂浆苏州展会
6、
广东隔音涂料-HY-T1
7、玻化微珠保温砂浆保温性能和优势
8、
抗裂砂浆施工工艺及注意事项
9、
无机保温砂浆检测报告
10、隔音砂浆|隔音涂料|隔音垫